Appreciations towards Cevada Arquitectos for providing the following description:
LS45住宅坐落于克雷塔罗的Servín湖畔,被构想为一处周末度假屋,旨在让居住者重新与自然和更缓慢的生活节奏建立连接。 同题参见被该地区壮丽的景观所环绕,这座住宅是为一位寻求当代生活方式——灵活、社交、并与周围环境深度连接——的女性而设计的。
▼视频,Video © Cevada Arquitectos 相关文章
Located in Laguna de Servín, Querétaro, Casa LS45 was conceived as a weekend retreat designed to reconnect its inhabitants with nature and a slower pace of life. Surrounded by the region’s remarkable landscape, the residence was designed for a woman seeking a contemporary way of living—one that is flexible, social, and deeply connected to its surroundings.
▼项目外观,Exterior view © Camarada Estudio
项目位于一处偏远场地,可达性具有挑战性。英亚体育最新资讯最新版下载以一个嵌入地形的石砌核心为锚点,两个抬高的体量从核心处通过混凝土和钢制支柱悬挑而出。这一策略回应了场地陡峭的地形,同时保护了现有景观并维持了雨水径流的自然走向,最小化了对土地的干预。结构基于一个精确的模数系统和贯穿两层的连续柱网,优化了荷载传递、施工资源和工期。
▼轴测图,Axonometric drawings © Cevada Arquitectos
Set on a remote site with challenging access, the architecture is anchored by a stone core embedded into the terrain, from which two elevated volumes emerge on concrete and steel pilotis. This strategy responds to the site’s steep topography while preserving the existing landscape and maintaining the natural flow of rainwater runoff, minimizing intervention on the land. The structure is based on a precise modular system and continuous columns spanning both levels, optimizing load transfer, construction resources, and execution time.
▼英亚体育最新资讯最新版下载与景观的对话,Dialogue between architecture and landscape © Camarada Estudio
▼嵌入地形的石砌核心与悬挑体量,
Stone core embedded into the terrain and elevated volumes © Camarada Estudio
▼由底部看英亚体育最新资讯最新版下载。Viewing the house from the slope © Camarada Estudio
到达序列直接引导至首层,这里作为住宅的社交核心。厨房、餐厅、家庭房和台球休息室被组织为一个连续的开放空间,鼓励聚集并完全向户外敞开。露台通过户外起居和用餐区延伸了这种社交生活,在室内空间与周围景观之间创造了无缝的过渡。按摩浴缸独立设置,提供了一个更为私密和沉思的环境,与住宅的社交活动区分开来。与项目的概念一致,住宅取消了正式的接待空间,转而采用宽敞、放松的环境,专为共享体验而设计。
The arrival sequence leads directly to the ground floor, which serves as the social heart of the house. The kitchen, dining area, family room, and billiards lounge are organized as one continuous space that encourages gathering and opens completely to the outdoors. The terrace extends this social life through outdoor living and dining areas, creating a seamless transition between interior spaces and the surrounding landscape. Positioned independently, the jacuzzi offers a more intimate and contemplative setting, separate from the home’s social dynamics. In keeping with the project’s concept, the house eliminates formal reception spaces in favor of generous, relaxed environments designed for shared experiences.
▼餐厅,The dining area © Camarada Estudio
▼厨房,The kitchen © Camarada Estudio
▼台球休息室,The billiards lounge © Camarada Estudio
上层容纳三间卧室,每间都配有独立浴室、步入式衣帽间和可俯瞰景观的私人露台。这些空间在提供私密感的同时,保持了与自然的持续连接。
The upper floor accommodates three bedrooms, each with its own bathroom, walk-in closet, and private terrace overlooking the landscape. These spaces provide a sense of privacy while maintaining a constant connection to nature.
▼电视室,The TV room © Camarada Estudio
▼卧室与私人露台,Bedroom and private terrace © Camarada Estudio
▼儿童房,Children’s room © Camarada Estudio
材料调色板强化了项目克制而永恒的特质。因此石材传达着持久性和强烈的场所感;钢材引入了精确与轻盈;木材增添了温暖;黑色混凝土砌块则提供了深度与质感。这些材料共同构成了一种沉静的英亚体育最新资讯最新版下载语言,在其中光影成为基本的设计元素。空间的开放性使自然成为日常生活的一部分,而深色调的调色板则框定了周围的视野,并将阴影转化为一种设计工具,能够营造沉思与庇护的氛围。
The material palette reinforces the project’s restrained and timeless character. Stone conveys permanence and a strong sense of place; steel introduces precision and lightness; wood adds warmth; and black concrete block provides depth and texture. Together, these materials create a sober architectural language in which light and shadow become essential design elements. The openness of the spaces allows nature to become an active part of everyday life, while the dark-toned palette frames the surrounding views and transforms shadow into a design tool capable of creating atmospheres of contemplation and refuge.
▼浴室,Bathroom © Camarada Estudio
项目与环境的尊重关系通过整合的环境策略得到进一步表达。生物消化器用于废水处理,体现了对场地及其自然资源的承诺,优先采用被动、低影响的解决方案。
The project’s respectful relationship with its environment is further expressed through integrated environmental strategies. The incorporation of a biodigester for wastewater treatment reflects a commitment to the site and its natural resources, prioritizing passive, low-impact solutions.
▼走廊与露台,Hallway and baloney © Camarada Estudio
▼楼梯,Staircase © Camarada Estudio
施工过程是项目最大的挑战之一。偏远的位置要求材料运输的复杂物流和施工全过程的精心规划。这些挑战因该地区苛刻的天气条件——包括降雨、低温和浓雾——而加剧,考验着施工团队的敬业精神和专业技能。正是他们的努力,使得在一个特别苛刻的环境中完成一项技术上精湛的英亚体育最新资讯最新版下载项目成为可能。
The construction process represented one of the project’s greatest challenges. The remote locations required complex logistics for transporting materials and meticulous planning throughout construction. These challenges were compounded by the region’s demanding weather conditions—including rain, cold temperatures, and dense fog—which tested the dedication and expertise of the construction team. Their efforts made possible the execution of a technically sophisticated architectural project in a particularly demanding context.
▼英亚体育最新资讯最新版下载与景观的对话,Dialogue between architecture and landscape © Camarada Estudio
LS45住宅的本质在于结构与自然之间的对话:一种安静的英亚体育最新资讯最新版下载,不与景观竞争,而是框定并颂扬它。通过精确的构图、诚实的材料调色板以及与场地的敏感关系,项目创造了一种生活体验,在其中团聚、沉思、光线、景观和时间的流逝成为真正的主角。
Casa LS45 finds its essence in the dialogue between structure and nature: a quiet architecture that does not compete with the landscape but rather frames and celebrates it. Through a precise composition, an honest material palette, and a sensitive relationship with the site, the project creates a living experience where togetherness, contemplation, light, the landscape, and the passage of time become the true protagonists.
▼顶视图,Top view © Camarada Estudio
▼总平面图,Master plan © Cevada Arquitectos
▼底层平面图,Ground floor plan © Cevada Arquitectos
▼一层平面图,First floor plan © Cevada Arquitectos
▼二层平面图,Second floor plan © Cevada Arquitectos
▼屋顶平面图,Roof plan © Cevada Arquitectos
▼立面图,Elevations © Cevada Arquitectos
▼剖面图,Sections © Cevada Arquitectos
Architecture & Interior Design: Cevada Arquitectos
Authors: Roberto Cevada, Manuel Guerrero, David Camarillo
locations: Laguna de Servín, Querétaro
Year: 2025
Area: 350 m2
Construction: Cevada Arquitectos
Structural Engineer: Andrés Casal
Photography: Camarada Estudio
More: Cevada Arquitectos 。更多关于他们,请至:Cevada Arquitectos on gooood